全面了解灌漿料施工規(guī)定的相關(guān)事項
來源:http://m.daquanq.com.cn 日期:2023-05-16 發(fā)布人:
灌漿料在任何工程中進行施工操作的時候,都是有一些必要的注意事項,以此來保證施工,那么濟南灌漿料施工安全規(guī)定有哪些呢?下面小編為您分析:
When conducting construction operations with grouting materials in any project, there are necessary precautions to ensure construction. So what are the safety regulations for grouting material construction in Jinan? The following editor will analyze for you:
1.進入施工現(xiàn)場的作業(yè)人員必須正確佩戴安全帽,嚴禁酒后上崗、施工現(xiàn)場嚴禁吸煙、嚴禁隨地大小便。
1. Operators entering the construction site must wear safety helmets correctly, and it is strictly prohibited to work under the influence of alcohol. Smoking and urination are strictly prohibited on the construction site.
2.澆筑深基礎(chǔ)灌漿料前和在施工過程中,應(yīng)檢查基坑邊坡土質(zhì)有無崩裂塌的危險。如發(fā)現(xiàn)危險現(xiàn)象,應(yīng)立即排除。同時,工具、材料不應(yīng)堆置在基坑邊沿。
Before pouring the deep foundation grouting material and during the construction process, the soil quality of the foundation pit slope should be checked for any danger of collapse. If dangerous phenomena are found, they should be immediately eliminated. At the same time, tools and materials should not be stacked on the edge of the foundation pit.
3.澆筑灌漿料使用的溜槽及串筒節(jié)間應(yīng)連接牢固。操作部位應(yīng)有護身欄桿,不準直接站在溜槽幫上操作。
3. The chute and barrel joints used for pouring grouting materials should be firmly connected. The operating parts should have protective railings, and it is not allowed to operate directly on the chute.
4.澆筑無樓板的框架梁、柱混時,應(yīng)架設(shè)臨時腳手架,禁止站在梁或柱的模板或臨時支撐上操作。
When pouring frame beams and column concrete without floor slabs, temporary scaffolding should be erected, and it is prohibited to operate on the formwork or temporary support of the beams or columns.
5.澆筑房屋邊沿梁、柱灌漿料時,外部應(yīng)有腳手架或安全網(wǎng)。如腳手架平橋離開建筑物超過20cm時,須將空隙部位牢固遮蓋或裝設(shè)安全網(wǎng)。
When pouring grouting materials for the edge beams and columns of the house, there should be scaffolding or safety nets outside. If the scaffolding flat bridge is more than 20cm away from the building, the gap must be securely covered or a safety net installed.
6.澆筑拱形結(jié)構(gòu)時,應(yīng)自兩邊拱腳對稱地同時進行;澆圈梁、雨篷、陽臺,應(yīng)設(shè)防護措施;澆筑料倉時,下出料口應(yīng)先行封閉,并搭設(shè)臨時腳手架,以防人員下墜。
6. When pouring the arch structure, it should be carried out symmetrically from both sides of the arch foot simultaneously; Protective measures should be taken for pouring ring beams, awnings, and balconies; When pouring the silo, the lower discharge outlet should be closed first and temporary scaffolding should be erected to prevent personnel from falling.
7.夜間澆筑灌漿料,應(yīng)有足夠的照明設(shè)備。
7. When pouring grouting materials at night, there should be sufficient lighting equipment.
8.使用振搗器時,應(yīng)按灌漿料振搗器使用安全要求執(zhí)行,濕手不得接觸開關(guān),電源線不得有破損和漏電。開關(guān)箱內(nèi)應(yīng)裝設(shè)防濺的漏電保護器,漏電保護器其額定漏電動作電流應(yīng)不大于30mA,額定漏電動作時間應(yīng)小于0.1s。
When using a vibrator, the safety requirements for using the grouting material vibrator should be followed. Wet hands should not touch the switch, and the power cord should not be damaged or leaked. A splash-proof leakage protector should be installed inside the switch box, with a rated leakage action current of no more than 30mA and a rated leakage action time of less than 0.1s.
9.筑作業(yè)必須設(shè)專人指揮,分工明確。
9. The construction work must be commanded by a dedicated person with a clear division of labor.
10.灌漿料振搗器使用前必須經(jīng)過電工檢查確認合格后方可使用,開關(guān)箱內(nèi)必須裝置漏電保護器,插座插頭應(yīng)完好無損,電源線不得破皮漏電;操作者必須穿絕緣鞋,戴絕緣手套。
10. Before using the grouting material vibrator, it must be inspected and confirmed by an electrician to be qualified before use. A leakage protector must be installed in the switch box, the socket plug should be intact, and the power cord should not be broken or leaked; Operators must wear insulated shoes and gloves.


11.在溝槽、基抗中澆注灌漿料前應(yīng)檢查槽幫,確認安全后方可作業(yè)。
11. Before pouring grouting material into the groove and foundation, the groove edge should be inspected and confirmed to be safe before operation.
12.溝槽深度大于3m時,應(yīng)設(shè)置灌漿料溜槽,溜槽間節(jié)必須連接可靠,操作部位應(yīng)設(shè)防護欄,不得直接站在溜放槽幫上操作。溜放時作業(yè)人員應(yīng)協(xié)調(diào)配合。
When the depth of the groove is greater than 3m, a grouting material chute should be set up, and the joints between the chutes must be reliably connected. The operating parts should be equipped with protective barriers, and it is not allowed to directly stand on the chute side for operation. Operators should coordinate and cooperate when sliding.
13.泵送灌漿料時,宜設(shè)2名以上人員牽引布料桿。泵送管接口、安全閥、管架等必須安裝牢固,輸送前應(yīng)試送,檢修時必須卸壓。
13. When pumping grouting materials, it is advisable to have at least 2 personnel pull the distribution rod. The pumping pipe interface, safety valve, pipe rack, etc. must be installed firmly, and should be tested before transportation. During maintenance, pressure must be relieved.
14.澆筑拱型結(jié)構(gòu),應(yīng)自兩邊拱腳對稱同時進行,澆筑圈梁、雨蓬、陽臺應(yīng)設(shè)置安全防護設(shè)施。
14. The pouring of arch structures should be carried out symmetrically and simultaneously from both sides of the arch feet. The pouring of ring beams, awnings, and balconies should be equipped with safety protection facilities.
15.澆灌2m高度以上框架柱、梁灌漿料應(yīng)站在腳手架或平臺上作業(yè),不得直接站在模板或支撐上操作。澆灌人員不得直接在鋼筋上踩踏、行走。
15. Grouting for frame columns and beams with a height of more than 2m should be done by standing on scaffolding or platforms, and should not be done directly on templates or supports. Pouring personnel are not allowed to step or walk directly on the steel bars.
16.向模板內(nèi)灌注灌漿料時,作業(yè)人員應(yīng)協(xié)調(diào)配合,灌注人員應(yīng)聽從振搗人員的指揮。
16. When pouring grouting material into the template, the operators should coordinate and cooperate, and the pouring personnel should follow the command of the vibrating personnel.
17.澆筑灌漿料作業(yè)時,模板倉內(nèi)照明用電必須使用12V低壓。
17. When pouring grouting materials, 12V low voltage must be used for lighting in the template warehouse.
18.預(yù)應(yīng)力灌漿應(yīng)嚴格按照規(guī)定壓力進行,輸漿管道應(yīng)暢通,閥門接頭應(yīng)嚴密牢固。
18. Prestressed grouting should be strictly carried out according to the specified pressure, the slurry pipeline should be unobstructed, and the valve joints should be tight and firm.
有關(guān)對于灌漿料施工安全規(guī)定有哪些呢,暫時為大家介紹到這里,如果您對其講述還有其他疑問或者不了解之處,可直接咨詢我們工作人員,也歡迎來電http://m.daquanq.com.cn咨詢探討!
What are the safety regulations for grouting material construction? I will briefly introduce them here. If you have any other questions or are not familiar with them, you can directly consult our professional staff. You are also welcome to call us http://m.daquanq.com.cn Consultation and discussion!
-
濟南抹面砂漿避坑!墻面一捏就碎?這3個隱患要提前控制 -
濟南批膩子總起泡?原因找對不用愁,本地實用解決方案來了 -
油工師傅必看!濟南石膏粉凝固過快?原因和解決辦法都在這 -
濟南膩子粉,三步輕松修復(fù)家庭墻面起皮掉粉難題 -
濟南抹面砂漿:天冷了澆水養(yǎng)護真的不能少?一篇說清 -
濟南抹面砂漿:裝修施工的“基礎(chǔ)功臣”,規(guī)范操作才靠譜 -
濟南石膏粉裝修石膏線條,干得太快?家里這味調(diào)料就能救急濟南石膏粉裝修石膏線條,干得太快?家里這味調(diào)料就能救急 -
濟南膩子粉使用技巧:新房刮完膩子 7-10 天能入住?這些細節(jié)才是關(guān)鍵
相關(guān)推薦:
主站蜘蛛池模板:
久久狠狠高潮亚洲精品暴力打
|
亚洲欧美日韩高清中文在线|
人妻av天堂一区二区|
国产午夜人成视频在线观看|
丝袜美腿亚洲综合伊人|
69av视频在线|
亚洲精品美女久久久久网站|
97人妻蜜臀中文字幕|
久久国产免费直播|
无码中文av有码中文a|
久热精品免费|
欧洲精品久久久AV无码电影|
日本熟妇色xxxxx日本免费看|
一本一本久久a久久精品综合|
色偷偷亚洲av男人的天堂|
偷拍激情视频一区二区|
亚洲欧美日韩精品高清|
噜噜噜天天躁狠狠躁夜夜精品|
亚洲男人的天堂精品一区二区|
日本一区三区高清视频|
日韩啪啪精品一区二区亚洲av|
久精品国产欧美亚洲色aⅴ大片|
精品91精品91精品国产片|
狠狠综合久久综合鬼色|
熟女一区二区中文在线|
69av视频在线|
亚洲中中文字幕第一页|
欧美—iGAO视频网|
欧美激情,国产精品|
国产主播无套内射一区|
亚洲一区二区精品av|
精品999无码在线观看|
国产精品久久久久免费观看|
国产精品乱子伦一区二区三区|
国产一区二区三区杨幂|
亚洲综合在线亚洲综合在线|
99久久亚洲精品加勒比|
国产日本一区二区精品|
99久久国产一区二区三区|
久久人妻av中文字幕|
亚洲av成人一区二区三区网址|

魯公網(wǎng)安備