濟南石膏粉生產廠家談石膏粉檢測凝結時間的方法
來源:http://m.daquanq.com.cn 日期:2025-12-10 發布人:
石膏粉的凝結時間分為初凝時間及終凝時間。前者是在標準稠度的用水量下,石膏粉與水拌合直到混合料漿失去流動性開始變稠時所經過的時間;后者是在標準稠度用水量下,石膏粉與水拌合到混合料漿固化時所經過的時間。那么如何檢測其石膏粉的凝結時間?石膏粉生產廠家帶大家來了解一下。
The setting time of gypsum powder is divided into initial setting time and final setting time. The former refers to the time elapsed when gypsum powder is mixed with water at a standard consistency of water until the mixture loses its fluidity and begins to thicken; The latter refers to the time it takes for gypsum powder and water to solidify when mixed with water at standard consistency. So how to detect the setting time of its gypsum powder? Gypsum powder manufacturers will take you to learn more.
要知道合適的凝結時間是石膏粉生產時能否正常使用的重要因素。其初凝時間過短或者終凝時間過長都會影響正常生產。所以事先檢測石膏粉的凝結時間是非常有必要的。
It should be noted that the appropriate setting time is an important factor in the normal use of gypsum powder during production. If the initial setting time is too short or the final setting time is too long, it will affect normal production. So it is very necessary to check the setting time of gypsum powder in advance.
通常檢測石膏粉凝結時間的方法有劃痕法、維卡儀法兩種。其中劃痕法是使用比較普遍的一種檢測方法。其步驟如下:
There are usually two methods for detecting the setting time of gypsum powder: scratch method and Vicat apparatus method. The scratch method is a commonly used detection method. The steps are as follows:
1、將100毫升水倒入500毫升容器中,再將石膏粉試樣在1分鐘之內均勻的撒在水中,靜置30秒后,快速攪拌30秒,之后把石膏漿體倒入放置在在表面擦勻麻油的玻璃板上的銅管內,之后慢慢垂直向上提起銅管到20毫米處,讓石膏漿體平鋪成直徑100毫米-120毫米,厚度在5毫米的試餅。
1. Pour 100 milliliters of water into a 500 milliliter container, then evenly sprinkle the gypsum powder sample in the water within 1 minute, let it stand for 30 seconds, quickly stir for 30 seconds, and then pour the gypsum slurry into a copper tube placed on a glass plate with evenly brushed sesame oil on the surface. Slowly lift the copper tube vertically up to 20 millimeters, and let the gypsum slurry spread evenly into a test cake with a diameter of 100-120 millimeters and a thickness of 5 millimeters.
2、用5毫米直徑的玻璃棒每隔30秒劃割1次,且每次劃后需用軟布將玻璃棒擦拭干凈。一直到劃痕兩邊的料漿不再合攏時即為初凝。其初凝時間通常從石膏粉撒入水中開始算起,直到不再合攏。
2. Use a 5mm diameter glass rod to cut every 30 seconds, and wipe the glass rod clean with a soft cloth after each cut. The initial setting is when the slurry on both sides of the scratch no longer closes. The initial setting time is usually calculated from the moment gypsum powder is sprinkled into water until it no longer closes.
3、測定初凝后的試餅上用大拇指每隔10秒按壓1次,當按壓到印痕邊緣沒有水分出現即為終凝。其終凝時間通常由石膏粉撒入水中開始算起,直到邊緣沒有水分結束。
3. Press the test cake with your thumb every 10 seconds after initial setting. When no moisture appears at the edge of the imprint, it is considered final setting. The final setting time is usually calculated from the moment gypsum powder is sprinkled into water until there is no moisture at the edge.
本文由 濟南石膏粉 友情奉獻.更多有關的知識請點擊 http://m.daquanq.com.cn/ 真誠的態度.為您提供為全面的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.
This article is a friendly contribution from Jinan gypsum powder For more related knowledge, please click http://m.daquanq.com.cn/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.
主站蜘蛛池模板:
精品亚洲没码中文字幕|
天天摸天天操免费播放小视频|
噜噜噜久久|
亚洲AV无码一区二区水蜜桃|
精品乱码一区二区三四五区|
国产成+人+综合+亚洲欧美|
高清无码爆乳潮喷在线观看|
视频一区无码中出在线|
国产最新视频在线不卡|
景洪市|
久久福利青草精品资源|
日韩在线视频网站|
99r在线精品视频在线播放|
亚洲成片在线看一区二区|
精品国产v一区二区三区|
日韩精品首页在线观看|
国产精品久久久久久久久久影院|
国产目拍亚洲精品区一区|
亚洲一区二区三区免费不卡|
国产一区二区三区高清视频|
最新日韩精品视频在线|
亚洲狼人社区av在线观看|
国产高清天干天天视频|
国产精品三级在线播放|
亚洲人亚洲精品成人网站|
少妇高潮无码自拍|
亚洲公开免费在线视频|
国产一区二区精品久久岳
|
夜夜躁日日躁狠狠久久av
|
午夜在线观看有码无码|
午夜夜福利一区二区三区|
亚洲一区二区三区国产精品|
久久亚洲aⅴ精品网站婷婷|
亚洲一区二区国产日韩|
www.尤物视频.com|
精品国产网站|
漂亮人妻沦陷精油按摩|
国产青青草视频在线播放|
欧美视频九九一区二区|
免费av深夜在线观看|
日韩av日韩av在线|

魯公網安備